CEO Davis Larssen and VP, Digital Innovation Stuart Harvey provide the feature story on the front cover of this month’s Innovation & Tech OGV Energy magazine. Davis and Stuart give an exclusive, in-depth interview to the title looking at our exciting technology development in real-time optimisation alongside our partner Ortomation and how it can bring significant gains to owners and operators in offshore wind, from dynamic operational strategy to enhanced power yield and life extension.

The wide-ranging interview touches on Davis’s new position on the Boards of both Synaptec and Intelligent Plant, as well as the deployment of our ECG™ holistic subsea cable monitoring system on Equinor’s Hywind Scotland floating wind farm.

This article is reproduced with the kind permission of OGV Energy. To read the article online, please click here.