Case Studies

Case Studies

Protection structure removal and J-tube flange separation

Design and build of tooling for protection structure removal and J-tube removal for Technip's Sabratha Platform, in the Mediterranean Sea.

ROV operated subsea sampling system

Proserv was approached by a multinational operator to provide a system that could take production samples to support subsea meter calibration at water depths of 2,500 metres, in West Africa.

Diver operated subsea sampling system

A UK independent oil producer commissioned Proserv to design, manufacture and supply a subsea sampling system capable of capturing reservoir fluid samples at temperature from subsea Christmas trees.

Inde Lima platform decommissioning

Internal and external cutting decommissioning solution for the Shell Inde Field.

Frigg DP2 platform pile guide decommissioning

Cutting and recovery solution for pile guides on the jacket structure of the Frigg DP2 platform.

Welland platform decommissioning

Decommissioning solution for the Welland Platform utilising internal pipe cutters, chain manipulators and JetCut system.

Multi-string well severance

The first of its kind subsea well removal to be completed in the Gulf of Mexico.

SCM retrofit due to OEM obsolescence

Gilmore Regulator Certified Training

Critical Service Chemical Injection Regulator

Drill Pipe Riser Control System

Met Mast Removal Amrumbank West